BPT LinkLine NBPT Phase III (Angthong-Saraburi) Project

BAFS Fuel Pipeline Transportation Ltd. (BPT) would construct a new pipeline from an existing oil terminal in Saraburi (SRB) connecting to the NFPT multi-product pipeline in the vicinity of Angthong, central Thailand.

The project is termed as Saraburi-NBPT Link Line Project and will provide a supply route for HighSpeed Diesel (HSD) and Gasoline Base (GB) products from Maptaphut/Rayong and Sriracha sources via the Thappline pipeline system and the associated SRB Terminal facilities to the NFPT pipeline system serving the North of Thailand.

The Project includes:

  • Link Line SRB Pump Station, with tie-ins to the existing SRB Terminal facilities.
  • Link Line pipeline, approximately 52 km length
  • New Receiving Station on NBPT pipeline to receive product from Link Line into the NFPT pipeline.
  • Control & Communications facilities to enable the operation of the Link Line via the existing BPT control room at Don Muang (DMK).