STEP OF WORK — PHOTO RECORD

Hydrant System Installation
Olets Spool Riser 6" and Pit Box

13 Work Steps · 31 Site Photos
1

Install of Spool Riser 6" and Pit Box

2

Inspection – Fit-up Spool Riser 6"

3

Witness Inspection – Welding Joint of Riser Pit Box for Hydrant System

4

Inspection Confirms PT Root Pass Layer of Olets Spool Riser 6"

5

Inspection Confirms PT Testing – Weld Hot Pass Layer of Olets Spool Riser 6"

6

Witness Inspection – PT Test Pipe Spool Riser by Third Party, PAE

7

Wrapping Tape – Spool Riser 6"

8

Final Holiday Test @ 10 kV

9

Sand Backfill and Compaction

10

Install Outer Hydrant Pit Box and Repair Painting

11

Inspection and Pouring Lean Concrete

12

Inspection Rebar, Formwork and Pouring Concrete (Strength 350 ksc)

13

Inspection with Krabi Airport Authority